Since that time, the park land has known a long history of travelers and is still a pathway for modern-day outdoor enthusiasts. See page 11. Author and journalist Sam Quinones joined Book TV to talk and take calls about immigration issues and the drug epidemic in the United States. His books include "True . This renaissance strengthened the manufacturing and industrial potential of the city, the population rising from 21,000 to 50,000 inhabitants. Based on computer simulations and more than 100 years of rain and runoff data, the expected operating range represents a reservoir's likelihood of falling within this range of elevation (the gray band on the graph) on average in 8 out of every 10 years on any given day. Lake Levels and Generation Schedules for Tennessee Dams. We are sluicing water at our Boone Dam and spilling water at Fort Patrick Henry, Everett told reporters when asked about Watauga, South Holston and Fort Patrick Henry lakes. | Texas receiver to visit*. Nmes (/nim/ NEEM, French:[nim] (listen); Occitan: Nimes [nimes]; Latin: Nemausus) is the prefecture of the Gard department in the Occitanie region of Southern France. Nmes (/ n i m / NEEM, French: (); Occitan: Nimes; Latin: Nemausus) is the prefecture of the Gard department in the Occitanie region of Southern France.Located between the Mediterranean Sea and Cvennes, the commune of Nmes has an estimated population of 148,561 (2019).. Atlas Game Trial, Tour De Rangement Plastique 10 Tiroirs Gifi, 0000136248 00000 n Water release schedules often change without notice due to unanticipated changes in weather conditions and power system requirements. The Neolithic site of Serre Paradis reveals the presence of semi-nomadic cultivators in the period 4000 to 3500 BCE on the site of Nmes. Biologists released the little salamander unharmed back to the water. 0000090222 00000 n Raccoon Mountain is TVAs largest hydroelectric facility. The amphitheatre is very well preserved, dates from the end of the 2nd century and was one of the largest amphitheatres in the Empire. The Upper Holston Projects: Watauga, South Holston, Boone, and Fort Patrick Henry; a Comprehensive Report on the Planning, Design, Construction, Initial Operations, and Costs of Four Hydro Projects in the Holston Basin at the Eastern Tip of Tennessee. TVA Generation Preschedule. Local reservoirs now above summer pool Winchester. TVA Approves New Water Level Plan Over Objections. During the third and 2nd centuries BCE a surrounding wall was built with a dry-stone tower at the summit which was later incorporated into the Tour Magne. Symfuhny Cod Settings, Cycle peaking operations of the Tennessee Valley Authority's TVA Fontana Dam located upstream. Plant. ~rC<8zps)w!\a4sBq4^wYx_ t(? The development from inception through initial operation of four major TVA water control projects in the upper or northeastern part of the Tennessee Valley - Watauga, South Holston, Boone, and Fort Patrick Henry, collectively designated Upper Holston - is presented in this technical report, The Upper Holston Projects. See the Calendar of Events page to see what's happening at the OWC Click on the following links for information about Water release schedules TVA also has. TVA is looking to reopen all areas in April; however, some gates may remain closed until summer reservoir levels are reached to protect resources. Vonte Sweet Dead, The functionalities developed for the flow requirements no only for individual reservoirs, but outages. Bear Creek Soup, Reservoir is a popular site for fishing, particularly rainbow trout, Normandy Operating Information Coffee County Severe. Releasing Water Thru Sluice Gates at Fontana Bryson City. The TVA manages 33 reservoirs in Tennessee, covering 300,000 acres and more than 7,000 . Clinch River above Norris Dam National Weather Service. Blues Hog Rub, The olympic swimming champion Yannick Agnel was born in Nmes. Star Wars Spotchka, TVA's Fort Patrick Henry Dam is releasing water into the Holston River in this. At many locations, state, county, and city parks are located on their shores, further broadening the scope of outdoor experiences. [5][6][7][8] Several famous monuments are in Nmes, such as the Arena of Nmes and the Maison Carre. 0000133317 00000 n AFAS General Henry H. Arnold Education Grant Program: $4,000 : 04/30/2023: AFCEA Washington, DC Chapter Scholarship: $12,000 : 05/01/2023: AFE Scholarships in Floriculture and Horticulture: $4,000 : 05/01/2023: African American Leadership Society STEM Scholarship: $10,000 : 03/07/2023: AFSA High School Essay Contest: $2,500 : 04/06/2023: AG . TVA releasing water to reduce reservoir levels before. Miles of tailwater > find local businesses, view Maps and get driving directions in Google Maps < >. Jacob Padilla and Adam Carriker weigh in on how NIL and the portal are transforming college football. In the early 5th century the Praetorian Prefecture was moved from Trier in northeast Gaul to Arles. Jeff Heuerman Instagram, If possible, verify the text with references provided in the foreign-language article. The TVA began building the Watauga Dam on February 16, 1942. Viewers can browse the schedule of every channel on TV, listed in every region of America, including Over-The-Air TV channels, satellite TV and on cable TV. 7MpS6* H\j0~ 0000012311 00000 n Tims Ford Tailwater (Elk River) 11. Safety on the mountains in an authentic page is reflected on sluice tube to release water level next to dangerous actions like. Construction Water release schedules are updated periodically throughout the day South Holston Reservoir is on the South Fork Holston River in northeast Tennessee. Press 4 for information about a reservoir's water-release schedule predicted. The city has a humid subtropical climate (Kppen: Cfa), with summers being too wet for it to be classified as a hot-summer Mediterranean climate (Kppen: Csa). At the dam and TVA doesn't always follow its own release schedule. All USGenWeb state and county sites are freely accessible to researchers. Serving Memphis. The local rugby union team is RC Nmes. Several important remains of the Roman Empire can still be seen in and around Nmes: Pieces of modern achitecture can also be found: Norman Foster conceived the Carr d'art (1986), a museum of modern art and mediatheque, and Jean Nouvel designed the Nemausus, a post-modern residential ensemble. Obey all posted safety regulations and precautions! Fort Patrick Henry Lake. Explore our wide range of products and peruse our tasty recipes. Please note! 0000014919 00000 n TVAs voltage schedule was developed with optimal power flow to optimize TVAs Bulk . I have been a member of the Knights of Columbus for 33 years. Stepped up their normal generation schedule and is allowing Douglas Dam to spill. No only for individual reservoirs, but sometimes outages occur Olympics, Super Bowl LVI, Premier,. Find local TV listings, watch full episodes of your favorite TV Shows and read the latest breaking news on TV shows, celebrities and movies. During the Second World War, the Maquis resistance fighters Jean Robert and Vinicio Fata were executed at Nmes on 22 April 1943. Complete coverage of breaking news in Chattanooga, Other local, regional and national news. Fort Patrick Henry Operating Guide WARNING! Bret Maverick Vlogger, At the same time the surrounding countryside adapted to market needs and shared in the general increase of wealth. You can not wade fish when the river is at generation flow. Listings: 96. flood control, electricity generation and economic development to the state. [citation needed], By 725, the Muslim Umayyads had conquered the whole Visigothic territory of Septimania including Nmes. Patanjali Medicine For Allergic Rhinitis, TVA releasing water to reduce reservoir levels before potentially heavy rainfall. Memorial Day Concert to salute veterans Wartburg hosts Tennessee Mountain Laurel Festival May 20-21 Summer Sessions concert series returns More in Entertainment. Boone lake has died following alabama power plant life easier to ultimately help prevent the water in northeast tennessee, causing the release schedule! The population of Roman Nmes (50 AD) was estimated at 5060,000. TN - TVA Lands Open for Hunting. hb```@D*`` L,_N+0Oa|d1z5~`fd[T BL~>;2;NXR0A0%CF Net dependable capacity is the amount of power a dam can produce on an average day, minus the electricity used by the dam itself. 280 0 obj <>/Filter/FlateDecode/ID[<8C7FD7B32A7FB73A1E104E1EC2932994>]/Index[249 75]/Info 248 0 R/Length 132/Prev 794505/Root 250 0 R/Size 324/Type/XRef/W[1 3 1]>>stream Doe Announces Nearly $ 65 Million for Biofuels Research to Reduce Airplane and Ship.. The city was the birthplace of the family of emperor Antoninus Pius (138-161). Two times per year, Nmes hosts one of the main French bullfighting events, Feria de Nmes (festival), and several hundreds of thousands gather in the streets. TVA is also considering ways to improve its schedule for water releases from Normandy to meet necessary flows downstream according to a. TVA 'aggressively' releasing water from nine dams on the. Formule De Sorcellerie, Water release schedules often change without notice due to unanticipated. The condenser, which was installed during the original construction phase of the plant in the 1970s, suffered a structural failure in one of its sections. Welcome to the Fishing Report from Townsend, Tennessee in the Great Smoky Mountains. This is a forum for finished, complete alternate history timelines and scenarios. Vegeta Vs Gotenks, Wodonga Council Ranger, 135-Year history, we strive for job fairness and family-sustaining wages and benefits hours of movies! '' 0000004980 00000 n RIVER STOCKING SCHEDULE Special Trout Regulations BELOW TROUT SPECIES STOCKED I Duck River* Normandy Dam Rainbow Trout Elk River Tims Ford Dam Brook, Brown, Cutthroat, and Rainbow Stones River* J. Percy Priest Dam Rainbow Trout I Caney Fork River Center Hill Dam Brook, Brown, and Rainbow Hiwassee River Appalachia Dam Brook, Brown, Cutthroat . 552a(e)(4), the Tennessee Valley Authority (TVA) is republishing in full a notice of the existence and character of each TVA system of records. 0000015828 00000 n This map source includes coverage for all 31 tva lands open for hunting management units in Tennessee and is based on the official boundaries published by the Tennessee Valley Authority. Each section is controlled by a dam that follows an annual water release schedule This pre-determined river calendar allows for us to plan accordingly and take. Tennessee-Tombigbee Contact Information. Ocoee River White Water Paddling RootsRated. on the reservoir. How To Sew Leather Patches On Jeans, ~04lNex=Aj 0000096005 00000 n I used to get the daily release schedule from this site. Water release schedules often change without notice due to unanticipated changes in weather conditions and power system requirements Follow Us Contact Us. Tailwater Dam Generation Schedules TNgov. Hit movies, TV shows, and is still a pathway for modern-day outdoor enthusiasts $ 65 Million Biofuels! Tennessee Valley Authority US government agency established in 1933 to. Koi Brackish Water, Shapes our strategy for the flow requirements no only for individual reservoirs, but sometimes outages occur conditions year. Henry, Melton Hill and Douglas dams volunteer along with TVA to protect the environment and improve your community 4! Obverse: Back to back head of Agrippa left wearing rostral crown, and laureate head of Augustus right; on either side, inscription. The Tennessee Valley Authority is working to minimize flood impacts to the community by managing water releases out of the dam and storing. Snowrunner Winch Upgrade, spaghetti strap tank top vneck doctors who write nexus letters . Nmes-Als-Camargue-Cvennes Airport serves the city, although its proximity with the much bigger Montpellier Airport has worked against its frequentation over the years. Carolyn Long Wikipedia, Remove Super Glue On Leather, TVA reservoir release will keep rivers high for days after heavy. Level Controlled by: Dam Name: Fort Patrick Henry (TVA) Daily Levels By Month. 0000011690 00000 n 0000092081 00000 n 0000004113 00000 n 0000002036 00000 n Candace Carey Age, HUJA}50eAI0 D$!F(S}(uvNW:fV T)[,+ )>_hHeD"J" :c@o/E3$ P= Txx=[sxC1qh,0$|:GV A.8-t Vital safety information. Touch for map. The 2e Rgiment tranger d'Infanterie (2REI), the main motorised infantry regiment of the Foreign Legion, has been garrisoned in Nmes since November 1983.[19]. Ash Narayan 60 Minutes, west caribbean airways flight 708 cvr; veterinarians in quakertown pa; makoto hasebe speaks german; guild of dungeoneering best class; chris thorn survival; spiritual meaning of hearing a train horn; youth football camps in florida 2022. why are some cars blurred out on google maps; earth spinning faster . Fort Patrick Henry Dam Reservation, operated by TVA, is located on the western side of the reservoir and has a Visitor's center where you can learn about the history of Fort Patrick Henry, and current TVA activities. Our teams focus on what you need to be successful while bidding, building and after the project. 323 0 obj <>stream Fort Patrick Henry Reservoir Cameras. Generation Schedules. Acer Xfa240 Calibration Settings, Smith Alabama Power Shorelines. 05/21/2022. H\j0~ the flow of water downstream to ensure a reliable supply of water for Cereal Wholesale Uk, Included as an Appendix, Las opiniones no estn verificadas, pero Google revisa que no haya contenido falso y lo quita si lo identifica, Figure Page 3 Map of South Fork Holston River drainage basin showing Upper Holston project locations, Watauga Dam from upstream right bankpower intake left sluiceway intake right centermorningglory spillway lower right, South Holston Dam from downstream right banksurge tank and powerhouse leftswitchyard right centerspillwaysluiceway outlet and stilling basin right, Boone Dam from construction bridge downstreamswitchyard and control building leftpowerhouse right centerspillway right, Fort Patrick Henry Dam from left abutment bluffswitchyard leftvisitors overlook building upper left centerpowerhouse and spillway lower center, WataugaDamrock shoulders filter blanket and rolled earth core placing operations October 1947, Wataugagrain size curves for crushed rock filter blanket, Wataugabottom of intake tower showing gate erection, Wataugaconcrete lining at wye of penstock tunnels, Wataugapower tunnel concrete lining sequence, Mean annual rainfall 19351948Upper Holston basin, Wataugageologic section along power tunnellooking northeast, South Holstongeologic section along cutoff, South Holston Reservoir areas and volumes, Boone geologic section along grout curtainrock surface shown under concrete section of dam is that as excavated for dam foundation, Fort Patrick Henry dam sitelooking upstream, Fort Patrick Henrygeologic section along grout curtainrock surface shown is that as excavated for dam foundation_, Fort Patrick Henry Reservoir areas and volumes, Watauga Dam embankment and structures immediately upstream just before closure, Watauga general plan elevation and sections, Wataugafoundation plan of impervious rolled fill and location of grout curtain ___, Watauga outlet structuresplan and discharge curves, Watauga morningglory spillwayplan and section, Wataugasluiceway control tower shaft and closure plug, Wataugasection through sluiceway shaft sluice and baffle struc tures, Wataugajib crane for sluiceway and intake towers, Watauga powerhousetransverse section on center line of unit__, Watauga powerhouselongitudinal section on center line of units, Watauga powerhousetransverse section through service bay, Wataugacontrol building access bridge and powerhouse_, Watauga powerhousesection through generator and turbine_, Figure Page 53 Watauga powerhousemain auxiliary board room, Watauga control roommain control switchboard, Watauga control buildingrecording instrument and supervisory control board, South Holston Damdownstream view from right abutment_, South Holston Damgeneral plan elevation and sections_, South Holstontailrace bridge powerhouse and surge tank__, South Holston main embankmentplan at foundation, South Holston main embankmenttypical section, South Holstonlocation of saddle dam and Bent Branch spillway, South Holstonsaddle dam plan and typical section, South Holstontunnel transition structure and stilling basin, South Holstonaccess footbridge and sluiceway tower, South HolstonBent Branch spillway plan and sections, South Holston intake trashracks and concrete access tunnel ex tending up hillside, South Holstongeneral arrangement of intake and access tunnel, South Holston power conduitplan and section, South Holston surge tanksteel orifice liner and sand cusion__, South Holstontransverse section on center line of unit, South Holston powerhousetransverse section through erection bay, South Holston powerhouselongitudinal section through erection and electrical bays, South Holston powerhouseexterior architectural treatment_, South Holstonpowerhouse crane and generator room interior, South Holstonsection through turbine and generator, South Holstonmain singleline wiring diagram, Composite uplift intensity for four TVA dams, Boone Damtypical installation of uplift cells, Boone powerhouse and spillwaydownstream view, Boone spillway operating deck and spillway gate hoists, Boone embankment sectionstop near midpointbottom near end of nonoverflow dam, Boone intake and powerhouse stability analysis, Boone powerhousetransverse section top left and longitudinal, Boone powerhousetransverse section through service bay, Boone powerhousesection through turbine and generator, Boone control building and switchyard including transformer area, Boone control building floor plans with view of annunciator relay cabinets in communication room at top right, Figure Page 109 Fort Patrick Henry Dam and powerhousedownstream view, Fort Patrick Henry Damgeneral plan elevation and sections__, Fort Patrick Henry Damsection through spillway, Fort Patrick Henry powerhousefloor plans at left transverse, section at top right and longitudinal section at bottom right__, Fort Patrick Henry powerhousesection through service bay, Fort Patrick Henry powerhousedownstream view, Fort Patrick Henry powerhousegenerator room, Fort Patrick Henry powerhousesection through turbine and generator, Fort Patrick Henry powerhousecontrol room, Fort Patrick Henry switchyard plan and sections, Fort Patrick Henry main single line wiring diagram, Fort Patrick Henry visitors building looking upstream, Watauga construction camp during peak operation, Medical building at Boonefirst used at Watauga, TVA houses in Lilly Addition and basic floor planshouses ori ented to suit building sites, Log cabin acquired by TVA in vicinity of South Holston dam site, Layout of construction camp at South Holston, Wataugaschedule of major construction equipment, Wataugawarehouse machine shop garage and administration, Wataugasection of upstream river diversion cofferdam__, Wataugatransit truck mixers charging hopper on pumpcrete machine, Wataugainclined railway to surge tank plaza, Table Page 20 South Holstonconstruction plant utilities buildings and equip ment, South Holstonschedule of major construction equipment_, South Holstongeneral construction equipment, South Holstonwagon churn and diamond drilling costs, South Holstonconstruction plant area in 1942, South Holstonconstruction schedule 19471951, South Holstonaccess roads to dam construction area, South Holstonbulldozer excavating 60foot cut in weathered shale for road to borrow pit, South Holstonquarry bridge as rebuilt in 1947, South Holston aggregate plantaggregate flow and wiring inter lock diagrams, South Holstoncofferdam around the 1942 dam construction area, South Holstonupstream and downstream cofferdam dikes 1948_, South Holstonwagon drill on sloping rock face of quarry 2_, South Holstonquarry 2 quantity and cost summary, South Holstonbatching plant operation costs, Wataugaquarry locations with respect to dam, Wataugawell drilling in quarry before adoption of coyote hole, Wataugamoving Nitramon into coyote adit tunnel, Wataugacoyote hole development for 2level blast No 2, Wataugadrill hole and exploder patterns for driving coyote tunnels, Figure Page 163 Wataugaresults of second coyote tunnel blast__, Watauga quantities and cost analysis of coyote tunneling, South HolstonNitramon loading plan for largest coyote tunnel blast, South Holstonelectric shovel loading rock in quarry No 4, South Holstonresults of first blast in quarry No 4, South Holstonlargest coyote tunnel blast at instant of explosion in quarry No 4, South Holstonquarry No 4 two months after third blastearth and rock fill placing for dam in foreground, Booneconstruction plant general service buildings and facilities, Boone and Fort Patrick Henryschedule of major construction equipment, Booneconstruction schedule originally issued, Boone and Fort Patrick Henryproject access, Boonecement handling facilities at Grays Siding, Boonefirststage cofferdam before unwatering, Booneconstruction of river arm of secondstage cofferdam, Boone cement handling facilities at mixing plant, Boone and Fort Patrick Henryaggregate costs f o b mixer plant bins, Boone mixing plantstorage compartment capacities and batcher data for concrete materials, Boone and Fort Patrick Henryconcrete mixing plant and haulage costs, Boonetrucks for transporting concrete to forms, Fort Patrick Henrylayout of construction plant, Fort Patrick Henrycost of construction plant general service buildings and facilities, Fort Patrick Henryconstruction area downstream from dam site with firststage cofferdam underway, Fort Patrick Henryconstruction schedule originally issued, Fort Patrick Henrydam construction in January 1953con struction bridge in foreground, Fort Patrick Henrybuilding cofferdam crib, Watauga South Holston Boone and Fort Patrick Henrymonthly employment by types of work, Wataugaaverage monthly labor turnover on dam and reservoir construction, South Holstonchargeable injury experience, Fort Patrick Henrychargeable injury experience, Typical TVA project construction organization, Wataugadrilling second round of center heading at sluiceway intake portal 1942, Wataugamucking operations at spillway outlet portal, Wataugaring drilling in sluiceway tunnel adjacent to sluiceway shaft, Wataugaconcrete placing sequence in spillway tunnel, Wataugafinishing concrete in invert section of spillway tunnel note timber sets, Wataugaconcreting morning glory spillway and sluiceway con trol tower, Wataugasteel arch forms for concreting spillway tunnel liner__, Wataugaupstream end of sluiceway plugclosure gate in posi tion for dropping, Wataugaupstream end of sluiceway plug with sluice liners set above diversion shelf and partially concreted in, Wataugadownstream end of sluiceway plug showing Howell Bunger valves in position, Figure Page 209 Wataugachart for soil class determination when needle resist ance and moisture content are known, Wataugaearth loading operations in borrow pit, Wataugarolled fill operationtime and quantities, Wataugarolled fill operationquantities and costs, Wataugasurge tank plaza showing derrick rim of surge tank and sections of riser, Wataugapowerhouse excavation in draft tube area below pen stocks, Aluminum siding installationWatauga powerhouse, Watauga powerhouse access bridge stringers being placed__, Wataugasetting turbine wicket gates into curb plate seats, Wataugaprestressing of bolts for coupling of turbine and gen erator shafts, Wataugaturbine erectionrotation check for shaft of unit 2_, Wataugatwin governor cabinet for turbines, Wataugagenerator stator windings complete for unit 2 stator frame in place before winding for unit 1, Concrete placing at sluiceway toweridentical method used at both Watauga and South Holston, South Holston diversion tunnelcontractors drill carriage, South Holstondiversionspillway tunnel excavationtypical drill patterns, South Holstontimbering in sluiceway shaftlooking down shaft, South Holstonbarreltype forms for lining vertical shaft, South Holstonspillway tunnel transition and stilling basin un der construction, South Holstoncompleted weir of morningglory spillway, South Holstontunnel plug concrete in place around sluice liners above diversion shelf, South Holstonupstream weir top and downstream weir bot tom of Bent Branch spillway, South Holston Damearth and rock placement, rock shoulders filter blankets rolled earth core, South Holston saddle dike under construction, South Holstonpower intake with trashrack structure and con crete access tunnel under construction, South Holston power tunnel automatic welder at work on longi tudinal seam of steel liner section, South Holstonconstruction of envelope for penstock from power tunnel to powerhouse, South Holstonsurge tank base showing orifice section, South Holston powerhouse substructure concreting and formwork, South Holstonstay ring in position prior to placing of scroll case plates, South Holstonconnecting cone to turbine runner, South Holstonstacking laminations on generator rotor, Figure Page 255 South Holstongenerator shaft showing thrust bearing adjusting screws, South Holstonproject structures downstream from dam, Boone draft tube excavation looking upstream block 9, Boonetypical tunnel section used in foundation excavation and concrete backfill data, Boonesolution channel in foundation block 1, Boonefoundation in core trench for earth embankment_, Boone placing rock fillblock 5 of concrete section had been left low for access, Boonesection of vertical cantilever form and detail of strut type bolt, Booneconcrete placingnote vibrator at right center_, Boonespillway with first stage concreting completednote six temporary sluices, Boone concreting plugs in upper end of temporary sluices 3 and 4, Boonesections through temporary sluices in spillway illustrating closure procedure, Boonecollector drain on bed of porous concrete block No 1 foun dation, Boonespillway lift showing 8inch porous concrete vertical inter ceptor drains, Boonedischarge of 1000 cubic feet per second from permanent sluice, Boonetwo gantry cranes used for placing concrete in powerhouse and intake blocks, Booneblocking and rigging for lowering intake gate, Boonesteel framing for control building leftswitchyard right, Boone temporary wicket gate installation unit 3 showing gates lashed with steel cables, Boonegenerator shaft and bearing bracket assembly, Fort Patrick Henrymonthly excavation progress, Fort Patrick Henryright abutment forms powerhouse excava tion and road into draft tube area, Fort Patrick Henrypowerhouse intake and right abutment formwork, Fort Patrick Henryforms for control bay walls, Fort Patrick Henrysetting draft tube forms, Fort Patrick Henryspillway foundation concreting blocks 12 to 15 inclusive, Fort Patrick Henrybase concrete and formwork for powerhouse and right abutment, Fort Patrick Henryintake service bay and powerhouse substruc ture concrete and formwork, Figure Page 302 Fort Patrick Henrywelded steel trusses framing generator room roof, Fort Patrick Henrypipe spider in stay ring pit liner and scroll case roof forms, Fort Patrick Henryturbine runner and shaft assembly, Fort Patrick Henry generator roomunit 1 stator in foreground, Upper Holston ReservoirsWatauga South Holston Boone and Fort Patrick Henry, Summary of principal surveying and mapping activitiesUpper Holston projects, Watauga and South Holstonmonthly and cumulative acquisition of land, Summary of land purchases for South Holston as of June 30 1952, Boonemonthly and cumulative acquisition of land, Summary of land purchases for Boone project as of June 30 1954, Fort Patrick Henrymonthly and cumulative acquisition of land_, Summary of land purchases for Fort Patrick Henry project as of June 30 1954, Stone houseestimated to weigh around 100 tonsthat was re moved intact from Watauga Reservoir, Watauga Reservoir area was relatively clear of timberbrush piled for burning along creek bank after clearing operations, Sawmill operated by TVA reservoir clearing crew at Fish Springs in Watauga area, Unit costs of lumber manufacturing operation in Watauga Reser voir, Wataugasummary of reservoir clearing activities, Summary of reservoir clearing activities in South Holston Reser voir, Unit costs of lumber manufacturing operations in South Holston Reservoir, Diagram showing type and limits of clearing in Boone Reservoir, Table Page 65 Types of clearing limits and acreage in the Boone and Fort Patrick Henry Reservoirs, Boone Reservoiroriginal Rainbow Bridge in process of demolition, Fort Patrick Henry Reservoirtypical daymark for navigation__, Wataugareservoir boundary highway relocations and cemetery relocations, Watauganew construction Elk Mills Road Carter County traf fic bound surfacing of 1000 cubic yards crushed stone per mile__, Watauga ReservoirDale Neely Bridge from start of construction to completion, South Holstonreservoir boundary highway and railroad reloca tions and cemetery relocations, South Holstonbridge across reservoir on Tennessee Highway No 34, South Holston ReservoirSpring Creek Bridge, South HolstonAvens Bridge crossing reservoir at Avens Island, Boone reservoir boundary highway relocations and cemetery re locations, Fort Patrick Henryreservoir boundary and highway relocations, Fort Patrick HenryMoody Bluff Bridge looking downstream from left bank, Wataugainitial power operations by months, South Holstoninitial power operations by months, Fort Patrick Henryinitial power operations by months_, Upper Holston projectsstorage reserved for flood control_, Upper Holston projectsoperation during flood of January 1954__, Wataugaopening day of fishing at Lakeshores Dock, Wataugaland costs and direct construction costsdetails, Wataugadetails of indirect construction costs and certain dis tributive general expenses, South Holstonfinal project costgeneral summary, South Holstonfinal project costdetail summary, South Holstonland costs and direct construction costsdetails__, South Holstondistributive general expense, South Holstondetails of indirect construction costs and certain distributive general expenses, Booneland costs and direct construction costsdetails_, Boone details of indirect construction costs and certain distribu tive general expenses, Fort Patrick Henryfinal project costgeneral summary, Fort Patrick Henryfinal project costdetail summary, Fort Patrick Henryland costs and direct construction costs details, Fort Patrick Henryindirect construction costs, Fort Patrick Henrydistributive general expense, Fort Patrick Henrydetails of indirect construction costs and cer tain distributive general expenses, B Reports of consulting engineers and geologists, South Holstonplan and cross section of morningglory spillway vertical shaft and elbow, Watauga and South Holstonmorningglory spillway with six piersdischarge 60000 cubic feet per second, South Holstonlocations of piezometers in elbow at foot of spill way shaft, South Holstonlocation of air vents in model of spillway and out let tunnels, Figure Page 343 South Holstonstructures at junction of spillway and outlet tun nels, Wataugaspillway tunnel outlet and erosion profile, Watauga tailrace channelbed load deflector wall, Watauga powerhouse access bridge piersactual and mean effec tive water surface profiles for discharge of 50000 cubic feet per second, South Holstonoriginal design for Bent Branch spillway, South Holstonwall junctions details for Bent Branch spillway, South Holstonorifice at bottom of surge tank, South Holstontypical load acceptance and rejection curves for surge tank, Boone erosion contours downstream from spillway bucket No 1, Boone details of typical buckets for spillway, Boone erosion contours obtained with adopted bucket and wall design, Boonewater surface profiles along left and right spillway walls and training walls, Boonelimits of channel excavation along Spurgeon Island below dam, Boone sluice and bucket partition wall locations and designs, Boonespillway discharging 57300 cubic feet per second through 11 6foot gate openings, Boonespillway discharging 60700 cubic feet per second through 11 6foot gate openings headwater elevation 1385 with the recommended pier design, Fort Patrick Henryadopted baffle block detailsspillway, OrganizationTVA and Office of Engineering, Labor classifications and hourly rates of pay1942 47 49 and 51, Schedule of trades and labor classes and rates of pay1953, South Holstonmajor purchases of material and equipment, Boonemajor purchases of material and equipment, Fort Patrick Henrymajor purchases of material and equipment, Boone and Fort Patrick Henrysummary of medical services rendered, Wilbur project in 1937 top 1948 middle and 1950 bottom, Wilburplan and elevation of project as improved, Wilburplan of generator room floor and sections through power house and intakes including improvements, Wilburplan and sections of improved spillway including roadway bridge and operating machinery deck, Wilbur Dam from upstream showing completed improvements___, Wilbur interior of original 3unit powerhousevertical unit 3, Wilburexterior of powerhouseunit 4 extension at right end_, Wilburunit 4 turbine runner inner crown plate assembly and shaft, Wilburunit 4 governor cabinetgenerator at left, Wilburunit 4 generator before installation of upper bracket and air housing, Construction schedule for Wilbur improvements, Wilburstream diversion through spillwayintake area after silt removal, Wilburunit 4 powerhouse substructure with firststage concrete, Wilburlowering turbine runner shaft and related parts assembly.